Jump to content

T-34-85 tank with working tracks W.I.P


Message added by TopicLocker3000

This topic was automatically locked after 6 months of inactivity. If you are the topic owner, please contact a moderator to have it unlocked.

Recommended Posts

To start off the tracks need to be assembled, each link needs to have the correct custom rotation where the metal pin would stand in the real ones, once you have a couple done just copy and paste until its big enough to conect from start to end.

Remember that they are parented each one to its previous track.

After that you have to animate each frame with a certain interval (I like 10 frames) until the first link reaches the turning point where it wont go straight any longer (it should be at the bottom), then you search a point where the position links with the start and make it be the exact same to what the start is so you can copy and paste it and so on, that way then you can just change the speeds (and refine the shape).

 

It's advisable to use tracks that are symetric so you can copy one to the other side without bigger problems.

Edited by olmocap
Link to post
Share on other sites

Guest
This topic is now closed to further replies.
  • Recently Browsing   0 members

    No registered users viewing this page.

  • Create New...